New train maintenance hall
Objectives and scope
A first workshop concept from 2012 was already defined. The management asked Nicebe to rework the existing concept with predefined framework conditions.
The maintenance workshops are designed for 12 Abe 4/8 trains of 35 m length. This includes small and heavy maintenance, storage and workshops. 5 maintenance lanes are covered and 4 parking lanes are outside.
Project
- Project span 15 months
- Analysis and optimization of maintenance processes
- Analysis and optimization of business processes
- Dimension of the building
- Macro layout
- Detailed concept
- Optimization of the execution planning
Achievements
- 50% reduction in distance for bogie reconditioning
- 40% reduction in distance between tracks, warehouse and workshop
- 30% stock reduction
- 20% gain in overall efficiency
Related Video